HOME ABOUT US SERVICES PORTOFOLIO TRADE CONTACT US NEWS
CAIRO OTHER PROJECTS
 
MARSA ALAM
Owner: Emak for Utilities and Services (El-Kharafi Group)
Marsa Alam International Airport
Tower Village Utilities
Marine Area Utilities
Port Ghalib

 
Marsa Alam International Airport
  • Main Water Pumping Station.
  • Main Water Pipeline (With Length of 6 km).

Tower Village Utilities:
Mechanical Works:
  • Waste, Irrigation Water Pump Stations.
  • Connect the Plant to the Irrigation System.
  • Main Water and Irrigation Tanks.
Electrical Works:
  • Control Panels for the Mechanical Equipments.
  • Connect the Plant to the Power Station.
Water Supply Systems:
  • Pipe lines with Control Valves.
  • Networks Protection (Air Valves – Anti Hammering).
Sewage Systems:
  • Pipe lines with Manholes, Inspection Chambers and kerb inlets.
  • Waste Water Lifting Station.



Port Ghalib