Loaloa Heliopolis at North Coast |
Infra-Structure:- |
- Water Supply.
- Sewage Systems.
- Irrigation Systems.
- All Mechanical Works for Pump Stations, Sump Pits, Underground Tanks (1200 m3), & High Tank (200 m3).
|
El Kasr Village Marsa Matrouh
Owner: Saudi Egyptian for Construction Co. |
Infra-Structure:- |
- Water Supply.
- Sewage Systems.
- Irrigation Systems.
- Fire Fighting Systems.
- Set up High Tank with Cap. 300 m3, and underground Tank with Cap. 1600 m3.
- Implementation all Mechanical Works.
|
Ghazala Movenpick Hotel
Owner: Kato For Real Estate Development Co. |
Mechanical Works & General Networks for Ghazala Gulf at North Coast:- |
- Main Water Supply Tank (3000 m3).
- Binding Line Stations between Main Tank & General Networks.
|
Al-Fedaa Gardens (6 of October City)
Owner: Al-Fedaa Cooperative for Housing & Construction
Consultant: O.Y.K For Engineering Consultancy, Technical & Economic studies
- Electric Network Works (medium & low tension)
- Transformers
- Electric destribution panels
- Telephone Network Works
Work done 10 million EGP
|
|
Al-Fedaa Gardens (New Cairo City)
Owner: Al-Fedaa Cooperative for Housing & Construction
Consultant: O.Y.K For Engineering Consultancy, Technical & Economic studies
- Water Network Works
- Sewage Network Works
- Telephone Network Works
- Electric Network Works (medium & low tension)
|
|
Alexandria Free Zones Network Projects (GAFI)
Owner: General Authority for Investment & Free Zones GAFI
Consultant: Misr Consult (Enviromental Infra Structure Studies)
- Irrigation Network Works (18 KM)
- Fire Fighting Network Works
- Irrigation water tank (2500 cubic meters)
- Electro mechanical Works (pumps, control systems, electric works)
|
|
Palm Hills Development (6 of October City, phase 7 and extention)
Owner: Palm Hills Developments (PHD)
- Infrastructure works
- Irrigation Network Works
- Fire Fighting Network Works
- Water and Sewage Networks
|
|
Lake Dream (6 of October City)
Owner: Saudi Egyptian Construction Co
- Sewage Networks (main lines)
|
|